Home News About Us Contact Contributors Disclaimer Privacy Policy Help FAQ

Home
Search
Quick Search
Advanced
Fulltext
Browse
Collections
Persons
My eDoc
Session History
Login
Name:
Password:
Documentation
Help
Support Wiki
Direct access to
document ID:


          Institute: MPI für Astronomie     Collection: Publikationen_mpia     Display Documents



ID: 660620.0, MPI für Astronomie / Publikationen_mpia
Space-borne survey instrument operations: lessons learned and new concepts for the Euclid NISP instrument
Authors:Valenziano, L.; Gregorio, A.; Butler, R. C.; Amiaux, J.; Bonoli, C.; Bortoletto, F.; Burigana, C.; Corcione, L.; Ealet, A.; Frailis, M.; Jahnke, K.; Ligori, S.; Maiorano, E.; Morgante, G.; Nicastro, L.; Pasian, F.; Riva, M.; Scaramella, R.; Schiavone, F.; Tavagnacco, D.; Toledo-Moreo, R.; Trifoglio, M.; Zacchei, A.; Zerbi, F. M.; Maciaszek, T.
Publisher:SPIE
Date of Publication (YYYY-MM-DD):2012
Title of Proceedings:Observatory Operations: Strategies, Processes, and Systems IV
Start Page:id. 844804-844804
End Page:8
Volume (in Series):8448
Name of Conference/Meeting:Observatory Operations: Strategies, Processes, and Systems IV
Audience:Not Specified
Abstract / Description:Euclid is the future ESA mission, mainly devoted to Cosmology. Like WMAP and Planck, it is a survey mission, to be launched in 2019 and injected in orbit far away from the Earth, for a nominal lifetime of 7 years. Euclid has two instruments on-board, the Visible Imager (VIS) and the Near- Infrared Spectro-Photometer (NISP). The NISP instrument includes cryogenic mechanisms, active thermal control, high-performance Data Processing Unit and requires periodic in-flight calibrations and instrument parameters monitoring. To fully exploit the capability of the NISP, a careful control of systematic effects is required. From previous experiments, we have built the concept of an integrated instrument development and verification approach, where the scientific, instrument and ground-segment expertise have strong interactions from the early phases of the project. In particular, we discuss the strong integration of test and calibration activities with the Ground Segment, starting from early pre-launch verification activities. We want to report here the expertise acquired by the Euclid team in previous missions, only citing the literature for detailed reference, and indicate how it is applied in the Euclid mission framework.
Comment of the Author/Creator:Date: 2012, September 1, 2012
External Publication Status:published
Document Type:Conference-Paper
Communicated by:N. N.
Affiliations:MPI für Astronomie
Identifiers:URL:http://cdsads.u-strasbg.fr/abs/2012SPIE.8448E..04V
The scope and number of records on eDoc is subject to the collection policies defined by each institute - see "info" button in the collection browse view.